Monorail Hoist Crane

Go Contents
EN

Monorail Hoist Crane

Features

  • It is used after connecting the crane by fixing the driving rail (I-Beam) to the ceiling of the building.
  • It is suitable when the ceiling space is quite small.
  • It is installed directly on the ceiling, so the installation cost is low.
  • Construction time is saved.

Dimension

I-BEAM
A×B×t1
Bracket Pitch(m)
0.5ton 1ton 2ton 3(2.8ton) 5ton 7.5ton 10ton 15ton 20ton
200×100×7t 5.8 4.1
200×150×9t 8.3 5.9
250×125×7.5t 8.9 6.3 4.6 3.8 2.7
250×125×10t 10.6 7.5 5.5 4.5 3.5
300×125×8t 12.0 8.6 6.2 5.1 3.9 3.2 2.6
300×150×10t 13.9 9.9 7.2 5.9 4.6 3.9 3.3
300×150×11.5t 15.0 10.7 7.7 6.4 5.0 4.2 3.7
300×150×9t 15.2 10.8 7.9 6.5 5.1 4.2 3.4
350×150×12t 18.5 13.2 9.5 7.9 6.2 5.2 4.5
400× 150× 10t 19.2 13.6 9.9 8.2 6.4 5.4 4.4 3.1 2.6
400× 150× 12.5t 22.0 15.7 11.3 9.4 7.3 6.1 5.4 3.9 3.2
400× 175× 11t 8.1 6.8 5.9 4.2 3.4
400× 175× 13t 9.1 7.6 6.6 5.0 4.1
600× 190× 13t 12.9 10.7 9.4 7.2 5.7
600× 190× 16t 14.8 12.3 10.8 8.8 7.3
Min.Radius of curve(m) 1.5 1.5 1.8 1.8 2.3

Project Result

Ordering Party Specification Quantity Project
Waterworks Headquarters Daegu Metropolitan City 1ton/2ton/3ton 2/4/2 Production, purchase and installation of hoist facilities in water intake station & water purification station construction in the process of the 5th water supply expansion project
Goryeo Industrial Development Co., Ltd. 1ton/2ton/3ton 2/4/1 Hyeonpung sewage treatment facility (treatment plant) construction
Waterworks Management Office in Gwangju, Gyeonggi-do 2ton 2 Purchase of a Hoist
Daegu Machinery & Parts Research Institute 2.8ton 1 Manufacture and installation of an overhead crane in the prototype production room of the Mechatronics Industry Support Center
Gyeongsangbuk-do Gyeongsan-si 1ton 2 Purchase of a hoist for voltage transformation of equipment for the total phosphorus optimal control facility of the Gyeongsan Sewage Treatment Plant
Construction Management Headquarters in Daegu Metropolitan City 1ton/2ton 6/1 Manufacture and installation of a hoist for the total phosphorus optimal control facility installation work of the Sincheon Sewage Treatment Plant
Gyeongsangbuk-do Yeongcheon-si 1ton/2ton 1/1 The 3rd construction of wastewater treatment facility in Yeongcheon General Industrial Complex. Relay pump station/ hoist
Dong-gu, Daegu 5ton 1 Purchase and installation of monorail hoist (basement 1st floor) for safely treated water reuse business
Gyeongsangbuk-do Yeongcheon-si 2ton 2 Installation work of public sewage treatment facility located in Sinnyeong-myeon, Yeongcheon-si
Korea Environment Corporation 1ton/2.8ton/5ton 6/1/1 Request for a hoist for government-supplied materials for the second part of the facility factory located in Hanam Modernization Site
Yecheon Branch of Korea Rural Community Corporation 2ton 1 Purchase of overhead crane as supply material for multi-purpose rural water development project in Wolpo district
Jinji Construction Co., Ltd. 2ton 1 Installation work for industrial water supply in Yeongcheon General Industrial Complex

㈜신정기공

Head Office / First Factory
71, Gukgasandan-daero 28-gil, Guji-myeon, Dalseong-gun, Daegu, 43008, Rep. of KOREA
Tel. +82-53-617-2332
Fax. +82-53-617-2334
E-mail. sjvco1@hanmail.net
Second Factory
26-5, Gukgasandandong-ro 42-gil, Guji-myeon, Dalseong-gun, Daegu, 43008, Rep. of KOREA
Tel. +53-617-2003
Fax. +53-617-2077
E-mail. sjvco@naver.com